Engineering Trust. Building the Future. β€’ Residential | Commercial | Industrial
Complete Lifecycle Expertise

End-to-End Construction Solutions

From the initial geotechnical soil investigation to final MEP testing and turnkey handover, Synex Infra delivers 20 specialized construction stages under single-point professional accountability.

Calculate Full Project Cost β†— Browse All 20 Stages ↓
β˜… Integrated Innovation Suite

Services Catalog β†’ AI Building Designer

Plan, design, and validate your building projects with our automated 6-in-1 architectural and structural engineering suite: Floor Plans, 2D CAD Maps, 3D WebGL Models, Elevations, Interior Space Planning, and Preliminary IS 456 Structural Layouts.

Launch AI Building Designer β†—
Showing 20 construction services βœ“ All 20 Canonical Stages Deduplicated
Site Survey & Land Assessment STAGE 01 Pre-Construction & Planning

Site Survey & Land Assessment

  • Land measurement and boundary verification
  • Topographical and site-level survey
  • Soil testing and geotechnical investigation
  • Groundwater and drainage assessment
  • Site access and feasibility assessment
Architectural Design & Space Planning STAGE 02 Pre-Construction & Planning

Architectural Design & Space Planning

  • Floor plans and room layouts
  • Elevation and faΓ§ade design
  • 2D drawings and 3D visualization
  • Ventilation, natural lighting and space utilization
  • Staircase, balcony, parking and terrace planning
Structural Engineering & Design STAGE 03 Pre-Construction & Planning

Structural Engineering & Design

  • Foundation design
  • Column, beam and slab design
  • Reinforcement steel calculations
  • Load calculations and structural stability
  • Earthquake-resistant design
  • Structural drawings and specifications
Approvals, Estimation & Budgeting STAGE 04 Pre-Construction & Planning

Approvals, Estimation & Budgeting

  • Building plan approval and applicable permissions
  • Detailed quantity estimation and BOQ
  • Material and labour cost estimation
  • Project budget and construction schedule
  • Contractor agreements and scope definition
Site Preparation & Earthwork STAGE 05 Core Construction & Civil Works

Site Preparation & Earthwork

  • Site clearing and levelling
  • Excavation and earth removal
  • Filling, soil compaction and backfilling
  • Temporary site setup and safety arrangements
Foundation & Substructure STAGE 06 Core Construction & Civil Works

Foundation & Substructure

  • Isolated, combined or raft foundations as designed
  • Pile foundations where required
  • Footings, pedestals and plinth beams
  • Damp-proof course and foundation waterproofing
  • Underground services and plinth filling
RCC Structural Construction STAGE 07 Core Construction & Civil Works

RCC Structural Construction

  • Reinforcement steel cutting and binding
  • Shuttering and formwork
  • Concrete pouring, compaction and curing
  • Columns, beams, slabs and staircase construction
  • Concrete quality checks and structural inspections
Masonry & Brickwork STAGE 08 Core Construction & Civil Works

Masonry & Brickwork

  • Brick, concrete block or AAC block masonry
  • Internal and external walls
  • Door and window openings
  • Parapet walls and partition walls
Plumbing & Sanitary Works STAGE 09 MEP Services & Building Protection

Plumbing & Sanitary Works

  • Water supply pipelines and overhead/underground tanks
  • Bathroom and kitchen plumbing
  • Sewerage and drainage systems
  • Sanitary fixtures, faucets and fittings
  • Rainwater pipes and rainwater harvesting
Electrical Works STAGE 10 MEP Services & Building Protection

Electrical Works

  • Concealed wiring and conduits
  • Switchboards, sockets and lighting points
  • Distribution boards, earthing and circuit protection
  • Power backup, inverter and generator provisions
  • CCTV, doorbell, internet and smart-home wiring
Waterproofing & Damp Protection STAGE 11 MEP Services & Building Protection

Waterproofing & Damp Protection

  • Terrace and roof waterproofing
  • Bathroom and balcony waterproofing
  • Basement and foundation waterproofing, if applicable
  • Water tank waterproofing
  • Leakage testing and dampness prevention
Plastering & Surface Preparation STAGE 12 MEP Services & Building Protection

Plastering & Surface Preparation

  • Internal and external wall plaster
  • Ceiling plaster and surface levelling
  • Crack treatment and corner finishing
  • Putty preparation and finishing readiness
Flooring & Tiling STAGE 13 Finishing & Interior Works

Flooring & Tiling

  • Vitrified, ceramic, marble or granite flooring
  • Bathroom and kitchen wall tiles
  • Staircase and balcony flooring
  • Skirting, grouting and tile finishing
Doors, Windows & Fabrication STAGE 14 Finishing & Interior Works

Doors, Windows & Fabrication

  • Main doors and internal doors
  • Aluminium, uPVC or other window systems
  • Grills, railings and staircase handrails
  • Gates, safety fittings and metal fabrication
Painting & Decorative Finishes STAGE 15 Finishing & Interior Works

Painting & Decorative Finishes

  • Interior and exterior painting
  • Primer, putty and surface preparation
  • Texture paint and decorative finishes
  • Enamel painting and protective coatings
Interior Design & Fit-Outs STAGE 16 Finishing & Interior Works

Interior Design & Fit-Outs

  • Modular kitchen and wardrobes
  • False ceilings and decorative lighting
  • TV units, storage and custom furniture
  • Bathroom mirrors, accessories and interior detailing
External Development Works STAGE 17 External Development & Handover

External Development Works

  • Boundary walls, gates and compound paving
  • Driveways, pathways and parking areas
  • Surface drainage and rainwater management
  • Landscaping and garden development
  • Septic tank or sewage connection, where applicable
Quality Control & Site Supervision STAGE 18 External Development & Handover

Quality Control & Site Supervision

  • Cement, steel and aggregate quality checks
  • Concrete testing and curing inspections
  • Workmanship and drawing compliance
  • Plumbing, electrical and waterproofing tests
  • Site progress monitoring and defect correction
Project Management & Safety STAGE 19 External Development & Handover

Project Management & Safety

  • Labour and subcontractor management
  • Material procurement and inventory
  • Project timeline and cost control
  • Site safety, PPE and scaffolding inspections
  • Client updates and progress reporting
Testing, Handover & Maintenance STAGE 20 External Development & Handover

Testing, Handover & Maintenance

  • Final inspection and snag-list closure
  • Electrical, plumbing and drainage testing
  • As-built drawings and equipment manuals
  • Applicable completion or occupancy approvals
  • Warranty support and post-construction maintenance
Accurate & Transparent Billing

Need an Itemized Estimate for Your Site?

Use our interactive Construction Quotation Calculator to customize your scope of work and download an itemized quote with GST and area-wise costing in under 60 seconds.

Launch Quotation Calculator β†— Book Site Visit & Soil Test